Topic ID #26087 - posted 1/8/2013 8:32 PM

Country Bob aka Robert D Morgan vitae 2013



CountryBob

Robert D. Morgan

PO Box 57
Royalton, IL  62983
Cell Phone (618) 727 – 0536

Email: countrybob1965@yahoo.com

 

EDUCATION

2000-2001: Southern Illinois University, Carbondale, Illinois. Graduate school working toward an MA in Geography, specializing in GIS with a focus on remote sensing.

1991-1995: Southern Illinois University, Carbondale, Illinois. Received a BA in Anthropology with a focus on Archaeology and Physical Anthropology.

ADDITIONAL SKILLS

Supervisory: Supervising archaeological field crews of up to 45 people. Supervising small carpentry crews. Training others in work setting as well as a classroom environment.

Mechanical: Repairing small engines: chain saws, lawn mowers and hydraulic pump engines. Repairing automobiles: rebuilding engines, brakes, exhaust, wiring and changing parts. Reading and interpreting many types of technical drawings such as blue prints, schematics as well as computer-generated reports.

Carpentry: Worked for over 7 years in all aspects of residential carpentry. Performing precise measurement and marking of materials for cutting. Performing precise cutting and shaping of building materials with hand and or power tools. Erecting forms, wood framework, installing sub flooring, sheeting, partitions, floor joists, studding, and rafters. Installing trim, wood paneling, sheet rock, cabinets, windows, doors, hardware, siding, roofing and flooring. Checking accuracy with levels, rulers, plumb bobs, and framing squares and making necessary adjustments.

Tools/equipment used: Forklift, terra mite, end loader, knuckle boom, bobcat, air compressor, jackhammer, reciprocating saw, chainsaw, and welder as well as too many others to fully list.

Archaeological: Designing and building as well as implementing water screening operations. Surveying, site recording, mapping, interpreting maps, doing research, excavating, and doing data collection, processing and interpretation. Navigating through rough terrain in over 20 states, using a compass, maps and aerial photographs. Excavating over 80 historic and prehistoric burials. Supervising crews of up to 45 people.

Administrative: Creating, preparing and reviewing various detailed forms and documents. Detailed cataloging, tracking and organizing very large inventories. Doing records checks at county courthouses and libraries. Preparing written reports and charts on a variety of subject matter

Computer: Using Microsoft Office; Excel, Word, Power Point, Arc view GIS and Photo shop. Doing research on the Internet. Using assorted Microsoft and Linux programs

Logistics: Coordinating the activities various interested parties including clients, civil survey, land agents, equipment rental, environmental crews, motel reservations and geo-morphological services.

 

WORK HISTORY

Hycroft Mine Expansion

Phase I survey  and Phase II testing Winnemucca, NV

2012 Field Technician, WCRM

Newmont Mine Phase I

Phase I survey, Carlin, Nevada

2012 Field Technician, WCRM

ATEX Pipeline Phase I

Phase I survey, Harrison, OH

2012 Field Technician /  Crew Chief

Blanton & Associates

Round Mountain Phase III

Phase III mitigation, Hadley, NV

2011 Field Technician, WCRM

ORMA-DAT III

Phase III mitigation, Austin, NV

2011 Field Technician, WCRM

Timber Hill Phase I

Phase I survey, Manhattan, Nevada

2011 Field Technician, WCRM

Willow Island Phase III

Phase III mitigation, Willow Island, WV

2011 Field Technician, Site Carpenter

Gray and Pape Cultural Resource Management

Allied Mining Phase I

Phase I survey, Tonopah, Nevada.

2010 Field Technician, WCRM

Wildcat Phase I

Phase I survey, Lovelock, Nevada.

2010 Field Technician, WCRM

Hoosier Energy

Phase I survey, Terra Haute, Indiana.

2010 Field Technician, Gray and Pape Cultural Resource Management

St Louis COE Section 110 Inventory

Phase I, Lake Carlyle, Carlyle, Illinois

2010 Field Technician, John Milner Associates

KXL Pipeline

Phase I survey, Nebraska

2010 Crew chief, American Resources Group

Cushing Extension Pipeline

Rapid Response archaeological team lead, , Kansas and Oklahoma

2009/2010 Crew chief, American Resources Group

Cushing Extension Pipeline

Geoarchaeological testing, Kansas and Oklahoma

2009/2010 Crew chief, American Resources Group

Keystone Pipeline

Rapid Response archaeological team lead, Nebraska through Eastern Illinois.

2009/2010 Crew chief, American Resources Group

Mullenburg Phase II

Phase II testing of  15Mu265, 15Mu266 and 15Mu273, Kentucky

 2009 Crew chief, American Resources Group

Keystone Pipeline

Geoarchaeological testing, West Central, MO

2008/2009 Crew chief, American Resources Group

Keystone Pipeline

Geoarchaeological testing, East Central, IL

2009 Crew chief, American Resources Group

Keystone Pipeline

Phase II testing, Columbia, NE

2009 Crew chief, American Resources Group

Keystone Pipeline

Phase III mitigations, Moberly, Mo and Troy Mo

2009 Field Technician, American Resources Group

Indian River Lagoon

Phase II testing, 12 sites SE Florida

2008 Field Technician, New South Associates

Rex East 11PK1713

Phase III mitigation,  Pittsfield

2008 Crew chief, American Resources Group

Fults Site, Waterloo, IL

Phase II testing, Woodland

2008 Crew chief, American Resources Group

US Gypsum, Bridgeport, AL

Phase III mitigation and burial recovery: Archaic, Woodland and Mississippian

2007-2008 Field Technician, TRC Garrow

Quincy Walmart Project, Quincy WV

Phase III mitigation: Woodland and Archaic periods

2007 Crew Chief and safety officer, Mactec

Rex Pipeline East, IL

Phase I survey across central Illinois

2007 Crew Chief, Commonwealth Cultural Resources Group

Argosy Casino Project, Lawrenceburg, Indiana

Phase II testing and Phase III excavation:  Prehistoric -Historic

2006-2007 Field Technician, Cultural Research Analysts

Rex Pipeline

Several phase II’s testing of sites across MO. KS and NE

2006 Field Technician, American Resources Group

Keystone Pipeline

Several phase II’s testing sites across Illinois

2006 Field Technician, American Resources Group

Centerpoint Energy Pipeline

Phase I survey, across Oklahoma

2006 Field Technician, TRC Garrow

SESH Duke Energy Pipeline

Phase I survey, Hattiesburg, Mississippi

2006 Field Technician, TRC Garrow

Argosy Casino Project, Lawrenceburg, Indiana

Phase II testing and Phase III excavation: Prehistoric -Historic

2005 Field Technician, Cultural Research Analysts

Ravens ford Project, Cherokee, North Carolina

Phase III mitigation: Prehistoric -Historic 1930's

2005 Field Technician, TRC Garrow

Assorted short Phase I surveys, Indiana

2005 Field Technician, American Resources Group,

Holcim Phase III, Festus, MO.,

Phase III mitigation: Archaic, Woodland and Mississippian

2005 Field Technician, American Resources Group

Ravens ford Project, Cherokee, North Carolina

Phase III mitigation: Prehistoric -Historic 1930's 

2004 Field Technician, TRC Garrow

Brownsville Project, Murphysboro, Illinois

Phase III mitigation: Historic 1830's

2004 Field Technician, American Resources Group

Shawnee National Forest Project, Harrisburg, Illinois

Phase I survey

2004 Crew Chief / Subcontractor, Arthur Langhus Layne

Mark Twain National Forest Project, Potosi / Salem, Missouri.

Phase I survey.

2004 Field Technician, Parsons Engineering

Avon Park Military Base Project, Avon Park, Florida

Phase I survey & Phase II Testing

2004 Field Technician, Parsons Engineering

Cottage Grove Project, Harrisburg, Illinois

Phase III mitigation: Historic 1830 - 1950

2003 Crew chief / Field assistant; supervising 30 + crew members, American Resources Group

SR 45 expansion, State Line, Mississippi

Phase III mitigation: Woodland and Archaic periods

2003 Crew chief, pump mechanic, carpenter, DuVall & Associates

K02M001 Quarry Project, Mauckport, Indiana

Phase I Trenching

2003 Field Technician, Cultural Research Analysts
Camp JT Robinson Historic Revisit Project, North Little Rock, Arkansas

Phase I survey

2003 Field Technician, Parsons Engineering
Avon Park Military Base Project, Avon Park, Florida

2003 Field Technician, Parsons Engineering

Phase I survey

40sv63 Middle Creek Rd. Expansion Project, Sevierville, Tennessee

Phase III mitigation: woodland period

2002 Crew chief, DuVall & Associates

40sv51 Cemetery Removal Project, Sevierville, Tennessee.

Phase III mitigation and burial recovery: historic cemetery with prehistoric component

2002 Crew chief, DuVall & Associates

Highway 127 Albany Bypass Project, Albany, Kentucky.

Phase I survey

2002 Field Technician, Gray and Pape

Military Base Compliance Project, Fort Knox, Kentucky.

Phase I survey and Phase II testing

2002 Field Technician, Gray and Pape

Industrial Park Expansion Project, South Point, Ohio.

Phase II testing: Historic to Archaic

2002 Field Technician, Cultural Research Analysts

Bridge Replacement Project, Russellville, Kentucky.

Phase II testing: Woodland to Archaic

2002 Field Technician, Parsons Engineering

Mark Twain National Forest Project, Doniphan / Saint. Robert, Missouri.

Phase I survey.

2002 Field Technician, Gray and Pape

Menards Project, Columbus, Indiana.

Phase II testing: Woodland to Archaic.

2001 Field Technician, Gray and Pape

2001 Teaching Assistant, Southern Illinois University

Geography 310: Intro to Cartography, Lab sections: 001 and 002

2001 Field Technician, University of Tennessee

Highway 321 Expansion Project, Alcoa, Tennessee.

Phase III mitigation and burial protection: Historic through Paleo.

2001 Teaching Assistant, Southern Illinois University

Geography 310: Intro to Cartography, Lab sections: 001, 002 and 003

Geography 418: Intermediate GIS, Lab section: 003.

2000 Teaching Assistant, Southern Illinois University

Geography 310: Intro to Cartography, Lab sections: 001 and 003.
Park Access Road Reroute Project, Louisville, Kentucky

Phase II testing: Historic to Woodland.

2000 Field Technician, University of Kentucky
Multiple Pipeline Rerouting Projects, Northern Illinois

Phase I survey

2000 Field Technician, Gray and Pape

State Route 11/15 Expansion Project, Liverpoole, Pennsylvania

Phase III mitigation: Woodland through Paleo.

1999 Field Technician, pump mechanic, KCI Technologies Inc.,

Vector Pipeline Project, Northern Illinois and Indiana

Phase I survey and Phase II testing: multicultural

1999 Crew Chief; supervising 8 crewmembers, Gray and Pape Cultural Resource Management

Caesars Riverboat Casino Project, New Albany, Indiana

Phase III mitigation: Woodland through Paleo.

1998 Field, Lab Technician and Pump Mechanic, Indiana State University

Vector Pipeline Project, Northern Illinois and Indiana

Phase I survey and Phase II testing: Woodland.

1998 Field Technician, Gray and Pape Cultural Resource Management

U.S. Gypsum Plant Project, Bridgeport, Alabama.

Phase III mitigation and burial recovery: Woodland.

1997 Field Technician, DuVall and Associates

Northern Border Pipeline, Northwest to Southeast Iowa

Phase I survey.

1996 Field and Lab Technician, American Resources Group

Rose Hotel Project, Elizabeth Town, Illinois

Phase II testing: Historic through Woodland.

1996 Field and Lab Technician, American Resources Group

Buel House Project, Goreville, Illinois

Phase II testing: Historic through Woodland.

1996 Field and Lab Technician, American Resources Group

Switz City Mine Company Project, Switz City, Indiana

Phase I survey.

1996 Field and Lab Technician, American Resources Group

Jefferson Barracks Project, National Register District, St. Louis, Missouri

Phase II testing: Historic.

1995 Field and Lab Technician, American Resources Group

Lake Red Rock Flowage Easement Project, Lake Red Rock, Iowa

Phase I survey

1995 Field and Lab Technician, American Resources Group

Amax Coal Company, Delta Mine Project, Crab Orchard, Illinois

Phase I survey.

1995 Field and Lab Technician, American Resources Group

Southern Illinois University, Carbondale, Illinois.

1994 Field and Lab Technician, Center for Archaeological Investigations

Southern Illinois University, Carbondale, Illinois.

1993 Field Technician, Southern Illinois University

Murdale Airport Runway Project, Carbondale, Illinois

Phase II testing and Phase III mitigation: Woodland.

1993 Lab Technician, Center for Archaeological Investigations

Wickliffe Mounds Research Center, Wickliffe, Kentucky

Phase III mitigation and burial recovery: Mississippian.

1993 Field Technician, Southern Illinois University

REFERENCES

Jared Barrett, Staff Archaeologist, TRC Garrow, 1865 Air Lane Dr. Suite 9, Nashville, TN 37210-3814

Office: (615) 884 - 4430 Fax: (615) 218 – 6307 Cell: (615) 218 – 6307 Email: jbarrett@trcsolutions.com

Alexandra D. Bybee, RPA, Staff Archaeologist, Cultural Resource Analysts, Inc., 143 Walton Avenue, Lexington, Kentucky 40508. Office: (859) 252-4737 Email: bybee@crai-ky.com

Matthew P. Purtill, Principal Investigator, Gray & Pape, Inc, 1318 Main Street, Cincinnati, OH 45210

(513) 287-7700 mpurtill@graypape.com

Patrick D. Trader, Principal Investigator, Gray & Pape, Inc. 1318 Main St., Cincinnati, OH 45202

(513) 287-7700 ptrader@graypape.com

Thomas Fugate, Field Director, Gray & Pape, Inc., 1318 Main St., Cincinnati, Ohio 45210

Office: (513) 287-7700 ext 111 (voice) (513) 287-7703 (fax) Email: tfugate@graypape.com

Bradley M. Mueller, Archaeologist, 13160 N W 11th Dr., Sunrise, FL 33323

Home: (954) 835-0996 Cell: (678)-209-8604 Email: arkee2@aol.com

Kit W. Wesler, Professor of Archaeology, Murray State University,

Murray, Kentucky 42071. 270-809-3457 kit.wesler@murraystate.edu

Mark R. Norton, State of Tennessee, Division of Archaeology, Archaeologist II

Office: (901) 988-5533 Email: mrnorton@usit.net

Dr. Charles "Chip" McGimsey, State Archaeologist, Louisiana

P.O. Box 44247, Baton Rouge, LA 7080. (225) 342-8170 cmcgimsey@crt.state.la.us

G. F. (Nick) Fielder, State of Tennessee, Division of Archaeology, State Archaeologist

Office: (615) 741-1588 Ext.13 Email: nfielder@mail.state.tn.us

 

PUBLICATIONS

Morgan,  Robert  ( Author )

2009     Phase I Cultural Resources Survey of the Illinois Segment of the Proposed Keystone Pipeline Project Corridor, Madison, Bond, Fayette and Marion Counties, Illinois. North University Dr. Access Road (Major Change Request No. 8B-2-008), Highway 159 Access Road, and Liberty Road Extra Work Space (Major Change Request No. 8B-2-010), Madison County, Illinois (CRM 1675).

2009     Phase I Cultural Resources Survey of the Illinois Segment of the Proposed Keystone Pipeline Project Corridor, Madison, Bond, Fayette and Marion Counties, Illinois. Norfolk Southern Access Road (CRM 1675).

2009   Phase I Cultural Resources Survey of the Illinois Segment of the Proposed Keystone Pipeline Project Corridor, Madison, Bond, Fayette and Marion Counties, Illinois. Liberty Access Road (CRM 1675).

2009   Phase I Cultural Resources Survey of the Illinois Segment of the Proposed Keystone Pipeline Project Corridor, Madison, Bond, Fayette and Marion Counties, Illinois. Wilderness Lane Access Road (CRM 1675).

2009      Phase I Cultural Resources Survey of the Illinois Segment of the Proposed Keystone Pipeline Project Corridor, Madison, Bond, Fayette and Marion Counties, Illinois. Hunter School Access Road (Major Change Request No. 8B-2-49 Access Road (CRM 1675).  

Morgan,  Robert  (Contributing Author)
   
2009    Phase I Cultural Resources Survey of the Missouri Segment of the Proposed Keystone 
   Pipeline Project Corridor, Buchanan, Clinton, Caldwell, Carroll, Chariton, Randolph,   
  Audrain, Montgomery, Lincoln and St. Charles Counties, Missouri (CRM 1575).

 

2009 Phase I Cultural Resources Investigation of IBR #24, a Proposed Injection Well and Two, Alternative Coal-Slurry Pipeline Corridors Located within Gibson County Coal Mine Permit No. U-22, Gibson County, Indiana.






(c)1996-2014, archaeologyfieldwork.com

Visit our Employment Network websites: archaeologyfieldwork.com - museumjobsonline.com - For information on advertising on this website, contact webmaster@archaeologyfieldwork.com